Next Wellness Club
Commercial wellness and recovery facility — sauna, steam and recovery zones engineered for high-traffic members' use. Our most recent completed Saudi commission.
Istanbul
+90 (532) 215 64 78
info@saunadekor.com
Location
Ziya Gökalp, Metal İş Sanayi Sitesi Yolu 20. Blok No:17-19,
34490 İkitelli Osb/Başakşehir/İstanbul/Turkey
Dubai
+971 58 558 1295
info@saunadekor.com
Location
Latifa Tower Dubai, World Trade Centre, Dubai UAE
Boston
+1 (617) 645 13 50
info@saunadekor.com
Location
66 Long Wharf, Unit 4B, Boston, MA 02110 USA
Interior design is the art and science of enhancing the interiors.
Ziya Gökalp, Metal İş Sanayi Sitesi Yolu 20. Blok No:17-19, 34490 İkitelli Osb/Başakşehir/İstanbul/Turkey
+90 532 215 64 78
info@saunadekor.com.tr
Sauna Dekor builds steam rooms, saunas and hammams in Saudi Arabia — steam room installation and sauna room construction taken from shop drawings to commissioning under one contract, for wellness facilities in Riyadh and across the Kingdom — hotel thermal suites, villa spas and recovery rooms taken from concept to commissioning under one contract. Manufacturing since 1987, now in our 40th year, with projects delivered in more than 35 countries and a Saudi record that includes a sauna and hammam suite in a Riyadh residential community.
Steam room construction, sauna room construction and hammam fit-out — design, in-house manufacturing and installation of saunas, hammams, steam rooms, pools and complete wellness facilities across Riyadh, Jeddah, Dammam and Al Khobar, with a Gulf-wide track record since 1987.
Every project is designed, engineered and manufactured in-house, with production and supply hubs across Türkiye, Germany and the Netherlands — then delivered and supported on the ground across the Kingdom, coordinated through our Gulf office at Latifa Tower, Dubai.
Contracts and invoicing structured for Saudi projects — international (USD/EUR) and regional invoicing through our Gulf entity, with a single point of contact throughout.
Every installation is engineered to the Saudi Building Code 2024 — SBC 401 (Saudi Electrical Code) and SBC 801 (Saudi Fire Protection Code), issued by the Saudi Building Code Center — SASO and SABER conformity, and General Directorate of Civil Defense fire-safety standards.
From 3D design and technical documentation to custom marble and Nordic woods — one team from concept to handover, backed by a 24-month warranty.
Contrast therapy is our craft. Every temperature on this spectrum is a facility we design, manufacture and install for projects across the Kingdom.
Plus salt rooms, ice fountains, shower systems, massage rooms and complete hotel wellness floors — for villas, developers, hotels and design consultancies across Riyadh, Jeddah, Al Khobar, Dammam and the Kingdom's Vision 2030 hospitality destinations. A members' club or gym cabin is a different specification from a villa one, because it runs all day at commercial load — see our gym sauna commercial-duty guide for the sizing, heater and ventilation figures.
Every discipline a wellness project needs — under one roof, coordinated across Saudi Arabia and the GCC.
Business planning, layout design, conceptual design, 3D visualisation, cost estimation, spec & BOQ preparation.
Explore → 02MEP coordination, material submittals, shop drawings and full technical documentation for consultants and contractors.
Explore → 03Custom marble, selected woods and certified components — produced across our Türkiye and European facilities.
Explore → 04Our own installation teams on-site across Saudi Arabia — commissioning, BMS integration and staff training included.
Explore → 05Door-to-door delivery with Saudi customs clearance handled end-to-end.
Explore → 0624-month warranty, maintenance contracts and technical support coordinated through our Gulf office.
Explore →Completed Saudi work in the Eastern Province and Riyadh, backed by a Gulf-wide institutional portfolio.
Commercial wellness and recovery facility — sauna, steam and recovery zones engineered for high-traffic members' use. Our most recent completed Saudi commission.
A combined sauna and hammam suite in a private Riyadh residence. Private clients are never named — described by location only.
Spa and fitness scope for a landmark members' venue — pools, sauna, spa hot tub and steam rooms, delivered to institutional standards.
Diplomatic-mission spa and wellness package — institutional-grade delivery in the Gulf.
Additional GCC and Saudi references are available on request under NDA. Site visits to selected completed projects can be arranged for serious procurement discussions.
Saudi Arabia is the one Gulf market where the classic limescale warning is justified, and the code framework was restructured recently enough that most submittals still name a body that no longer exists.
The current basis is the Saudi Building Code 2024 — for our scope principally SBC 401, the Saudi Electrical Code, and SBC 801, the Saudi Fire Protection Code (the informal name "Saudi Fire Code" is not the official title). It is issued by the Saudi Building Code Center (SBCC): Council of Ministers Resolution No. 656 of 04/09/1446H converted the former National Committee (SBCNC) into an independent centre, so documents naming SBCNC are out of date. Fire-safety approval is the General Directorate of Civil Defense under the Ministry of Interior. Separately, imported heaters, control panels and electrical fittings must be registered on SASO's SABER platform with a Product Certificate of Conformity before a shipment certificate is issued and customs will clear — we handle that registration as part of the package, not as a client action item.
Coastal Gulf cities run on pure desalinated water, which is soft. Riyadh does not: the network blends desalinated supply from the coast with deep groundwater, and the numbers show it. Peer-reviewed sampling of Riyadh tap water reports TDS from 68 to 793 mg/L with a mean of 499 mg/L (Alanazi et al., 2021) — right at the level WHO associates with excessive scaling in pipes, water heaters and boilers — and Saudi Water Authority authors put the groundwater feeder at 197–281 mg/L as CaCO₃ total hardness against a 60–80 target for desalinated product (Al-Hamzah & Fellows, 2024). At that hardness a steam generator without softening will scale. On Riyadh projects we specify softening on the steam feed as standard and confirm which supply the building is actually on, because the blend is not uniform across the city.
Riyadh's summer dry-bulb is almost identical to Doha's — ASHRAE puts the 0.4% design DB at King Khalid International at 44.9 °C — but the 0.4% evaporation wet-bulb is 21.0 °C against Doha's 31.2, roughly ten kelvin lower. The consequences are concrete: evaporative cooling is genuinely viable for plant heat rejection in Riyadh where it is marginal on the coast; an open cold plunge loses noticeably more water to evaporation and needs its make-up and level control sized for it; and a steam room in dry air has a harder job holding 100% relative humidity at the bench than the same room in Doha.
Sources: Saudi Building Code Center (sbc.gov.sa) for SBC 401 and SBC 801, 2024 edition, and for Council of Ministers Resolution No. 656; SASO and the SABER platform; Alanazi et al., Journal of Environmental Science and Public Health 5 (2021) 137–154; Al-Hamzah & Fellows, Water 2024, 16, 1810; WHO background document on total dissolved solids; ASHRAE Handbook—Fundamentals, Climatic Design Conditions (2021 ed.), King Khaled Intl, WMO 404370.
Site survey in Riyadh, 3D visualisation, material selection, full technical documentation.
In-house production across our Türkiye and European facilities — Germany & the Netherlands — custom marble, selected woods, CE / TÜV / GS certified components.
Door-to-door logistics with Saudi customs clearance handled end-to-end.
Our own teams on-site across Saudi Arabia — SBC 401 / SBC 801 / Civil Defense-compliant commissioning, BMS integration, staff training.
24-month warranty, maintenance contracts and support via our Gulf office.
On a Saudi hotel or villa project we work as a specialist subcontractor to the main contractor, not as the builder of the shell. The scope line below is the one we write into tender returns, and it is the line that decides whose budget carries the tanking, the drainage, the power and the treated make-up water.
Shop drawings and technical submittals; the thermal room itself — sauna cabin, steam room, laconium, caldarium and rasul chamber; the göbek taşı and the kurna in a hammam; the steam generator, and the halogenerator where a salt room sits in the brief; benches, doors, glass, marble and mosaic finish; the room's own lighting, sensors and control panel; commissioning and handover documentation. A salt room is worth calling out separately: the halogenerator, the brine feed and the salt-resistant substrate come with our package, and a general tiling subcontractor cannot substitute for that detail.
The room shell and its structural slab; waterproof tanking and the screed falls; the floor gully and the drainage run back to the stack; a dedicated electrical supply terminated at our panel position; the treated make-up water line; extract ductwork beyond our terminal; and the fire detection loop that Civil Defense inspects under SBC 801. If the tanking or the falls are wrong, no steam room finish will survive them — which is why the wet-area substrate is inspected and signed off before our first delivery reaches site, and why a late change to the slab level is the most expensive variation on this package.
Power: a dedicated circuit sized to the generator or heater load and terminated at the panel position, coordinated under SBC 401. Water: a softened feed on the steam line — at Riyadh hardness an unsoftened generator will scale, so the softener, the blowdown drain, and the balance tank where a hydrotherapy pool shares the plant room all have to appear on the MEP drawing before the slab is poured. Extract: the terminal inside the room is ours, the duct run and the fan belong to the MEP contractor, and the two are dimensioned together at coordination stage rather than resolved on site.
Commissioning is a witnessed sequence, not a switch-on: generator output measured against room volume, temperature and humidity held at setpoint over a timed run, drain and blowdown proven, sensor calibration recorded, control panel and BMS points mapped, then Civil Defense inspection. Handover carries as-built drawings, the SABER Product Certificate of Conformity for the imported equipment, O&M manuals, a spares list and operator training. Warranty is 24 months on the scope we supply and install, with maintenance contracts and support through the Gulf office. Our quality management system is certified to TS EN ISO 9001:2015.
For tender purposes the package is normally priced as separate line items — thermal room supply, marble and mosaic finish, steam generator and halogenerator, controls and sensors, freight and Saudi customs clearance, site installation, commissioning, operator training and warranty — so that a main contractor can compare returns like with like and see exactly which scope sits outside the wet-area builder's work. Send drawings and a room schedule and we will return a scope matrix set against them.
Hotel and resort wellness projects delivered across 35+ countries since 1987
Yes. Sauna Dekor delivers across the Kingdom with on-site installation and commissioning teams, with completed work in Al Khobar and active engagements in Riyadh. Regional operations are coordinated through our Gulf office — Al Parimar Trading L.L.C., Latifa Tower, Dubai — and consultations are available on-site in Saudi Arabia or virtually.
We quote per project rather than publish a range, because the same specification lands at a very different total from one building to the next. What moves the figure is the size of the cabin or wet room, the timber and stone grade, the heater or steam generator selected, how much of the enclosure is glass, the waterproofing, tanking and drainage the room already has, and how far power, water, drainage and ventilation have to be brought to it. Send us the room dimensions, the ceiling height, the access route and the services already reaching the space, and we return an itemised, position-by-position quotation covering equipment, construction and installation.
A single sauna or steam room typically takes 6–10 weeks from design approval to commissioning, including manufacturing at our Türkiye and European facilities and installation in the Kingdom. Complete villa spa packages run 12–16 weeks; hotel projects are scheduled per the construction programme.
Yes. All installations are engineered to the Saudi Building Code 2024 — SBC 401 (Saudi Electrical Code) and SBC 801 (Saudi Fire Protection Code), issued by the Saudi Building Code Center — SASO and SABER conformity, and General Directorate of Civil Defense fire-safety standards, coordinated with project consultants and municipality requirements where applicable.
International invoicing in USD or EUR and regional invoicing through our Gulf entity are available, with contracts structured per project alongside the international options of our parent company established in 1987.
Book a consultation, request a position-by-position quotation, or send us your architect's drawings — we respond within one business day.
Delivering across Riyadh, Jeddah,
Al Khobar & Dammam
+971 58 558 1295
info@saunadekor.com
Consultations by appointment
On-site in Saudi Arabia & virtual
Adding {{itemName}} to cart
Added {{itemName}} to cart