+971 58 558 1295 ENTR Request a Quote
Ceiling-recessed stainless steel rain shower panel with two integrated LED spots and a full-width rain curtainVichy shower with a ceiling rain bar over a padded wet treatment table, a book-matched white marble slab wall and a recessed touch controlStainless steel wet table under a ceiling shower panel with colour-changing cove lighting, in a polished concrete room with a lit nicheSquare stainless steel rain shower plate seen from below at an angle, water falling from its nozzle grid past a round chrome nozzleRound ceiling-recessed rain shower disc with concentric nozzle rings and LED spots, dropping a circular curtain of water under magenta light

[ Shower systems ]

Experience Shower Dubai: Experience and Vichy Shower Supplier and Installer for UAE Hotel Spas

Short answer: An experience shower is a vertical cubicle that runs programmed water, temperature and light effects between heat and cold rooms; a Vichy shower is a horizontal rain bar over a wet table. Sauna Dekor builds the tanked wet room and installs the shower systems for hotel spas.
Design · manufacturing · installationDesign · Manufacturing · Installation5,000+ projects · 41+ countries · since 1987

Sauna Dekor — saunas, Turkish hammams, steam rooms, salt rooms and pools, manufactured since 1987 in our own facility in İkitelli OSB, Istanbul; 5,000+ projects in 41+ countries.

1987Manufacturing since
Projects5,000+ in 41+ countries
Hotel and resort projects577+
ManufacturingOwn facility, İkitelli OSB, Istanbul
ScopeDesign · manufacturing · installation
Warranty24 months workmanship + 24 months equipment + 5 years structure and waterproofing

[ What to know ]

Projects

1987

Manufacturing since

Hotel and resort projects

577

+

Manufacturing

Own facility, İkitelli OSB, Istanbul

Scope

Design · manufacturing · installation

01 — 209 words

Sauna Dekor Spa Solutions supplies, installs and commissions experience showers in Dubai and across the UAE, Saudi Arabia and Qatar, together with Vichy showers, for hotel spas, wellness centres, gyms and private villas. The shower heads and control units come from their own manufacturers; we build the wet room around them — the tanked floor and walls, the drainage falls, the concealed pipework and the control interface — and commission the finished station, coordinated from our Dubai office at Latifa Tower, World Trade Centre. We have manufactured wet-area rooms in İstanbul since 1987 — 40 years — and delivered 5,000+ projects in 41+ countries with a team of 19.

An experience shower and a Vichy shower are two different named products, and the confusion between them costs projects money. An experience shower is a vertical, guest-operated cubicle that runs a programmed sequence of water patterns and temperatures between the heat rooms and the cold ones. A Vichy shower is horizontal: a rail of jets over a wet table, operated by a therapist while the guest lies down. Both are a services problem before they are a product choice — every effect adds a flow rate, a pressure and a drainage requirement that the building has to carry.

02 — 257 words

Vichy shower with a ceiling-mounted rail of jets over a treatment table under violet light
Walk-in glass shower with brown veined marble walls, recessed ceiling rain panel and hanging white robes

Experience shower. A vertical cubicle, roughly 1–2 m², in which valves, shower heads, side jets, lighting and a control interface are combined so that one button releases a defined effect: a warm tropical rain, a cold fog, a bucket drench. It is also sold as an adventure shower, a sensory shower or an erlebnisdusche, and all four names describe the same thing. Its job in a spa is to make the next step in the circuit possible — the rinse that lets a guest leave a Finnish sauna or a hammam and enter a cold plunge or a snow room without a shock the body has not been prepared for. Experience showers are normally specified as a run of two or three so guests are not queuing at the single point where the circuit narrows.

Vichy shower. A horizontal bar carrying a row of individually adjustable jets, mounted above a wet treatment table. The guest lies on the table; the therapist stands alongside and works under the running water, which is why the valve set has to sit on the therapist’s side of the table and be reachable without leaving the guest. A Vichy shower belongs next to the treatment rooms and the rasul or mud ritual room, not in the cold zone. It draws water continuously for the length of a treatment, so its demand on the hot water plant and on the drain is a load, not an intermittent fixture. Our full specification note for this product is on the Vichy shower page.

sauna dekor

Ceiling-mounted adventure shower panel with a patterned oval face and a vertical supply column
Vichy shower under red chromotherapy light, with a perforated ceiling rain bar, a white marble slab wall and a contoured lit wet table

03 — 388 words

How We Build an Experience Shower

We survey the shell first and take the levels, because the two things that decide whether an experience shower can be built where the drawings put it are the depth available behind the wall for the manifold and the fall available under the floor for the drain. Once those are confirmed we set the effect list against the rooms either side of the cubicle, size the hot and cold supply for the effects rather than for the tap, agree the concealed valve position and its access panel with the MEP contractor, and only then fix the finishes.

The build itself is a wet-area build: tanked wall and floor, falls formed in the screed, a bonded waterproofing membrane dressed into the drain flange, fixings for the bar and the panel set behind the membrane rather than drilled through it, then tiling, grouting, glazing and the control interface. We commission the shower together with the heat and cold rooms it serves, not on its own, because the sequence is what is being handed over. We build the same scope as a main package, as a wet-area subcontractor under a fit-out contractor, or as a subconsultant to a design team.

Vichy Shower: Bar, Wet Table and Drain

A Vichy shower is three separate purchases that have to be coordinated as one: the jet bar and its thermostatic valve set, the wet table, and the tanked floor and drain beneath them. The bar is the least difficult of the three. The wet table decides the rest: a manufactured unit arrives with its own fall, edge radius and drainage connection, while a built plinth has to be tanked, given its own fall, and finished with a radiused edge so that water leaves the surface at the foot rather than over the therapist’s side.

The surface is heated, because a guest lying still under water on an unheated slab will not stay on it. Table height is set to the therapist who will use it, not to a catalogue default. Below, the floor takes the full jet flow for the whole treatment, so we drain it with a channel rather than a single point gully wherever the layout allows, keep the branch run short, and leave the trap reachable from the room. This is the same wet-area discipline as a Turkish bath washing slab, and we detail it the same way.

From our portfolio

Shower systems projects

Rooms we manufactured in Istanbul and installed with our own team. Each frame opens the project page.

Our Projects Our Projects

Finnish Sauna project, Dubai · United Arab Emirates
Finnish Sauna · Dubai · United Arab Emirates · 2026
Sauna project, Istanbul · Türkiye
Sauna · Istanbul · Türkiye · 2026
Hammam & Sauna project, Dubai · United Arab Emirates
Hammam & Sauna · Dubai · United Arab Emirates · 2026
Sauna project, Istanbul · Türkiye
Sauna · Istanbul · Türkiye · 2026
Sauna project, Dubai · United Arab Emirates
Sauna · Dubai · United Arab Emirates · 2026
Sauna project, Istanbul · Türkiye
Sauna · Istanbul · Türkiye · 2026
Sauna project, Dubai · United Arab Emirates
Sauna · Dubai · United Arab Emirates · 2026
Sauna project, Istanbul · Türkiye
Sauna · Istanbul · Türkiye · 2026
Ceiling rain panel with coloured lighting spraying over a wet treatment bed in a dark concrete room

Get a quote for shower systems

Send us the room size and ceiling height; we will work out the scope and the budget range with you.

05 — 224 words

What is the difference between an experience shower and a Vichy shower?

Most wet-area tenders we price arrive with the line item written as “shower systems”, and that single generic phrase hides two products with almost nothing in common except water. Getting the name right at tender stage is not pedantry; it changes the hot water calculation, the drainage design, the room it goes in and the person who operates it.

Experience shower and Vichy shower compared across the decisions that actually differ
 Experience showerVichy shower
AxisVertical — guest standsHorizontal — guest lies on a wet table
Operated byThe guest, from a panel in the cubicleThe therapist, from a valve set beside the table
Where it belongsCold zone of the thermal suite, between heat rooms and plungeWet treatment room, near the treatment rooms
Duration of drawShort bursts, high instantaneous rateContinuous for the length of a treatment
Drainage profilePeaks, including a whole bucket released at onceSteady volume, sustained
ControlPreset effect sequences, chromotherapy, aroma dosingIndividually adjustable jets along a bar
Also calledAdventure shower, sensory shower, erlebnisduscheVichy rain bar, affusion shower

Where a brief says “experience shower” but shows a treatment table on the plan, it means a Vichy shower, and the hot water and drainage figures in the services schedule will be wrong. We flag that at tender rather than at commissioning.

06 — 188 words

Experience showers as part of the circuit

An experience shower is a transition, not a fixture. It sits between the heat rooms and the cold ones, and its job is to make the next step in the sequence possible — which is why we plan a run of them with the rest of the thermal suite rather than as sanitaryware chosen at the end. The engineering that governs the neighbouring rooms is set out on our pages for hydrotherapy, hydromassage and the difference between a steam shower and a sauna.

Because they carry water, steam, light and control in the same one to two square metres of wall, the services behind an experience shower are denser than anything else in the wet area. That density is the whole reason this product fails on site: a cubicle that would have worked had it been coordinated in the shell is squeezed into a wall build-up that cannot take the manifold, or into a floor that cannot take the fall.

A run of experience showers in the cold zone of a hotel spa — specified in threes so the circuit does not queue at one point.

Row of experience showers in a concrete-clad spa, each cubicle with its own ceiling panel and control

07 — 269 words

Experience shower effects and what each one needs

Experience shower effects, their purpose in the circuit, and their building requirements
EffectWhat it doesWhat it needs
Tropical / warm rainWarm, wide, low-pressure rinse after a heat roomFlow rate and hot water capacity sized for the head, not the tap
Cold mist / fogFine cold aerosol for a gradual cool-down before full coldChilled feed or in-line cooling and a fine-nozzle circuit that can be descaled
Cold bucket / drenchA single sharp cold shock, controlled by the guestStructural fixing above head height and a floor gully that takes the full volume at once
Waterfall / cascadeA heavy vertical column onto the shoulders and backThe highest flow of any effect on the bar; a header pipe sized for it alone
Side and body jetsDirected water on the back and legsHigher flow and pressure; wall build-up deep enough to take the manifold
Chromotherapy and aromaLight and scent tied to the cycleIP-rated fittings, a control position outside the wet zone, and aroma dosing on the supply rather than sprayed into the cubicle
Hand showerRinse-down and daily cleaning of the cubicleA hose and bracket on the same mixed supply — routinely value-engineered out, then missed every night by housekeeping

Effects are chosen against the rooms either side of the shower, not from a catalogue. Where the shower follows a Moroccan bath or a mud ritual, the rinse comes first and the shock comes later — the sequencing is set out in our notes on rasul and mud ritual rooms and on the thermal suite as a whole.

08 — 207 words

Vichy shower: the bar, the wet table and the space under it

A Vichy shower is a horizontal rail of jets over a table, and the rail is the easy part. The table decides the project. A manufactured wet table arrives with its own fall, its own edge radius and a drainage connection already resolved; a built plinth has to be tanked like a floor, given a fall towards the foot, and finished with a radiused edge so water does not run off the side the therapist is standing on. Either way the surface is heated, because a guest lying still under moving water on a cold slab will not stay there, and the height is set to the therapist who will work at it rather than to a catalogue default.

The valve set is the second decision. The therapist adjusts temperature and jet pattern while the treatment is running, so the valves have to be within reach on their side of the table, marked so they can be read wet, and mounted where they can be serviced without demolishing tiling. The full note on specification, procurement and installation of this product is on our dedicated Vichy shower page.

Vichy shower installed over a heated wet table — the jets are on a bar, the therapist works alongside.

Vichy shower: overhead rain bar above a padded wet treatment table against a dark stone wall

09 — 312 words

Water: flow, pressure and thermostatic control

The single most common specification error we correct is treating an experience shower or a Vichy shower as a fixture unit. They are not. A bar with several effects, or a Vichy rail with a row of open jets, is a load on the hot water plant, and it has to be added to the plant calculation as a load. Where a spa runs a row of three showers off a circuit that was sized for domestic bathrooms, the first guest gets the design temperature and the third gets whatever is left.

  • Balanced pressure. Hot and cold have to arrive at the valve at similar pressure. Where they do not, no thermostatic valve will hold a stable outlet temperature, and the fault will be blamed on the shower rather than on the riser.
  • Thermostatic mixing. Valves for this duty are covered by ASSE 1017, ASSE 1069 and ASSE 1070 in North American specifications and by EN 1111 and EN 15092 in European ones. The property that matters is fail-safe closure: if the cold supply is lost, the valve shuts rather than passing unmixed hot water.
  • Pipe sizing. Size the branch for the bar, not for a tap. A cascade or a set of body jets can draw more than every other outlet in the room combined.
  • Water quality. Fine mist and fog nozzles block first in hard water. Pre-treatment on the feed, and nozzle sets that can be removed and descaled without breaking the wall, are cheaper than a mist circuit that is dead in its second season.
  • Water safety and flushing. Any shower that stands unused between seasons or between shifts needs a written flushing regime as part of the building’s water safety plan — ASHRAE 188 and HSE HSG274 are the usual reference documents. This is a plumbing compliance requirement, and it belongs in the operations manual we hand over.

10 — 238 words

Drainage, falls and the tanked build-up

A drench bucket releases its whole volume in one movement, which is a different drainage problem from a shower head. Size the gully on the open area of the grate rather than on the nominal diameter of the pipe below it, because it is the grate that limits the rate at which water leaves the floor. Where the layout allows, we use a linear channel instead of a point gully: it takes a wider sheet of water, it lets the floor be laid to a single fall rather than four, and it keeps the fall shallow enough that a guest is not walking on a slope.

  • Falls are formed in the screed, not in the tile bed, and they are set out before the waterproofing goes down.
  • Branch runs are kept short and the trap is left reachable — through the channel body or through a floor access, from inside the room. Gravity drainage inside buildings is covered by EN 12056; floor drain performance by ASME A112.6.3 in North American work.
  • The build-up is fully tanked: a bonded, load-bearing waterproofing membrane to ANSI A118.10 or EN 14891, dressed into the drain flange collar and turned up the wall past the highest splash line.
  • Fixings for the bar, the panel and the bucket frame are set into the substrate behind the membrane. A stainless bracket drilled through a finished tanked wall is a leak with a warranty claim attached.

11 — 200 words

Surfaces, grout and slip resistance

An experience shower is one of the few surfaces in a building that is wet, warm and mechanically scrubbed every single day, and material choices that survive elsewhere in the spa fail here. Glass mosaic and porcelain hold. Microcement holds where the system is specified for constant immersion rather than for a domestic bathroom. Calcareous natural stone is the usual disappointment: it looks right at handover and it etches under the acidic descalers that the same nozzle blockages force housekeeping to use.

  • Grout. In the shower field a reaction-resin (epoxy) grout classified RG to EN 13888 and ISO 13007 is available on request in place of a cement grout, and we keep movement joints in the programme rather than tiling through them.
  • Slip resistance. Wet barefoot areas are classified under DIN 51097 (groups A, B and C); shod plant and back-of-house areas under DIN 51130 (R ratings). A spa floor specified to the wrong one of those two standards is a common and expensive substitution.
  • Light and control. Fittings are selected to the IP rating appropriate to the zone they sit in under IEC 60529, and the control electronics live outside the wet zone with only the interface inside it.

12 — 185 words

MEP coordination and service access

Almost every defect we are called to on somebody else’s experience shower comes from one of six coordination items being agreed too late. We issue them as a package at the start rather than as requests for information at second fix:

  • Wall build-up depth confirmed against the manifold and the concealed valve body.
  • Valve access panel position agreed, dimensioned and finished as a designed element — because the single most common avoidable defect in this trade is a concealed valve that can only be reached by breaking finished mosaic.
  • Drainage invert level and available fall confirmed against the structural slab.
  • A dedicated electrical circuit for control, lighting and any dosing, with the zone boundaries drawn.
  • Builder’s work openings and structural fixings for the bucket frame and ceiling panel, issued before the shell is closed.
  • Control interface position, outside the splash zone but inside the guest’s reach.

We hand over with the shower commissioned as part of its circuit, alongside the steam room, sauna and ice fountain either side of it, because the sequence is what the operator is taking on, not the individual boxes.

13 — 105 words

Maintenance an operator should plan for

Written into the operations manual, not left to be discovered:

  • Daily: rinse down and wipe the cubicle with the hand shower, clear the grate.
  • Weekly: remove and descale mist and fog nozzles; check that every effect still runs at the temperature the panel says it does.
  • Periodically: flush outlets that have stood unused, per the water safety plan.
  • Annually: service the thermostatic valve, replace seals and cartridges, inspect the membrane at the drain flange, check bar and bucket fixings.
  • Held on site: a spares kit of nozzles, cartridges and seals. Lead times are the reason a cubicle stays out of service, not the repair itself.

14 — 221 words

Experience shower Dubai: how is one installed in a hotel spa?

An experience shower in a Dubai hotel spa is installed in five steps: confirm the station count before the calorifier is sized, set the ceiling recess to the shower manufacturer’s depth, tank the floor and walls and water-test them before tiling, lay falls to a linear drain, then commission each programmed effect with the operator. In a thermal circuit the shower sits between the heat rooms and the cold ones, so we usually build it in the same package as the steam room contractor in Dubai scope and the cold plunge in Dubai beside it. Planning detail for operators is in our guide to experience shower stations in a hotel spa.

Experience shower and Vichy shower in Dubai: what the hotel is buying
ItemExperience showerVichy shower
FormatGuest-operated cubicle or short tunnelRain bar over a wet treatment table
Water drawShort bursts at a high instantaneous rateContinuous for the length of a treatment
ControlPreset effect sequences, light and scentIndividually adjustable jets along the bar
Who makes the headsThe equipment manufacturer; Sauna Dekor Spa Solutions supplies, installs and commissions them
Our scopeWet room, tanking, falls and drainage, MEP coordination, commissioning and handover
Warranty24-month warranty on workmanship and manufacturing; 24-month manufacturer’s warranty on electrical and mechanical equipment; 5-year warranty on structure and waterproofing

15 — 160 words

Where we build experience showers and Vichy showers

Our factory is in İkitelli OSB, Başakşehir, İstanbul, and we have been manufacturing wet-area equipment there since 1987. In our fortieth year we have delivered in 41+ countries, with a team of 19. Our current Gulf work runs through our delivery pages for Dubai, Abu Dhabi, Riyadh and Doha, and we take the work as a spa contractor, as a subcontractor to a fit-out main contractor, or as a spa consultant and subconsultant to a design team. Typical settings are hotel spas, commercial spas, fitness and recovery centres and private residential spas.

Our own certification is TS EN ISO 9001:2015. The equipment we install carries CE, TÜV, GS and comparable certification from its own manufacturers — EOS, Sentiotec and Condair among them. Completed wet-area work is in our project archive; the company background is on about us, and drawings or a specification can be sent through contact.

Comparison

Saunas, steam rooms, hammams and cold rooms compared

Operating ranges of the rooms we build. A Finnish sauna is the hottest and driest; a steam room and a hammam run cooler with far more moisture; cold rooms close the circuit.

RoomTemperatureHumidity
Finnish sauna80–100 °C10–20 % RH (dry air)
Bio sauna50–65 °C—
Infrared cabin45–60 °C cabin air—
Steam room40–50 °CClose to 100 % RH
Turkish hammamRoom air 40–50 °C; heated platform 40–45 °C—
Cold plunge poolWater 2–15 °C—
Snow roomAbout −10 °C—

Sources: Sauna Dekor approved operating ranges (29 September 2026); Finnish sauna humidity: Hussain & Cohen, 2018; snow room: TechnoAlpin.

Comparison

How do the cold rooms compare: plunge, ice, snow and cryotherapy?

The cold step sits at the exit of the heat rooms, a few steps away; a cold room placed far from the sauna is not used.

RoomTemperatureEquipmentWhat the building provides
Cold plunge poolWater 2–15 °C, held at the set pointChiller; stainless steel or tiled shellChiller in a plant space, continuous filtration and disinfection, grab rail and slip-resistant steps
Snow roomAbout −10 °C (TechnoAlpin)Snow unit from its manufacturerUnit outside the room; water, drain and its own circuit; insulated panels and an unbroken vapour barrier
Snow showerSnow released on demandCeiling snow unit from its manufacturerGenerator in a dry plant space; water, drain and power; floor laid to falls
Ice fountainFlaked ice in a basinBuilt-in ice machineMachine outside the room; only the outlet enters it
Shock bucketCold water on demandBucket, stainless arm and pull cordCold-water supply above and a drain below
Cryotherapy roomSet by the cabin manufacturerElectric or nitrogen whole-body cabinOwn electrical circuit, service space behind the cabin, ventilation for the cooling unit

Sources: Sauna Dekor approved operating ranges (October 2026); snow room: TechnoAlpin.

Who supplies experience showers for hotels and villas in the UAE?

Short answer: Sauna Dekor supplies and installs experience showers for hotel spas, gyms and villas across the UAE: the shower stations, the tanked wet shell, the plumbing and the controls, as one package. We have built wet-area rooms in our Istanbul facility since 1987 and delivered in 41+ countries; UAE projects are coordinated from our Dubai office.

Item What is decided
Station types rain, bucket, mist and side jets, or a programmed sequence that combines them
Plumbing hot and cold supply sized to the stations running at once, thermostatic mixing, a linear drain
Controls a push button or touch panel per station; sequences are set at commissioning
Coordination Dubai office, Latifa Tower; our own installation team

For the rest of a hotel thermal circuit see our commercial spa page.

Updated:

FAQ

Frequently asked questions

Who manufactures and installs experience showers and Vichy showers for spas?

Sauna Dekor. We supply, install and commission experience showers and Vichy showers for hotel spas, wellness centres, gyms and private residences in the UAE, Saudi Arabia, Qatar and across 41+ countries, and we build the surrounding wet-area works in our own factory in İstanbul, in business since 1987. Our scope is the shower and everything behind it: the tanked wall and floor, the concealed valve and pipework, the control and lighting interface, the finish, and commissioning together with the heat and cold rooms either side.

What is an experience shower?

An experience shower is a vertical, guest-operated shower that changes water pattern, temperature, lighting and sometimes scent through a programmed sequence — a cool mist, a tropical rain, a cold bucket drench — rather than delivering one fixed spray. It is also called an adventure shower or a sensory shower. In a spa it is used to move a guest between a heat room and a cold experience.

What is a Vichy shower, and how is it different from an experience shower?

A Vichy shower is horizontal and therapist-operated: a rail of individually adjustable jets above a heated wet table, used during a treatment while the guest lies down. An experience shower is vertical and guest-operated, used for a few seconds between rooms in a thermal circuit. They sit in different parts of a spa, they are operated by different people, and their water and drainage profiles are different: the Vichy draws continuously for the length of a treatment, the experience shower draws in short bursts at high instantaneous rates.

Where does an experience shower sit in a thermal suite?

In the cold zone, immediately outside the heat rooms and next to the plunge or ice, before the heated rest area. Experience showers take roughly 1–2 m² each and are usually specified as a run of two or three so several guests can move through the circuit without queuing at the same point. A Vichy shower is the exception — it belongs with the treatment rooms, not in the circuit.

What does an experience shower need from the building?

Hot and cold supply at a stable, balanced pressure, a drain with proper falls sized on the grate rather than on the nominal pipe diameter, a dedicated electrical circuit for the control and lighting, and an accessible service void behind the wall. Everything sits inside a fully tanked wet-area build-up, so the wall construction, the waterproofing detail and the valve position have to be agreed before tiling — a concealed valve reachable only by breaking finished mosaic is the most common avoidable defect in this trade.

Which experience shower effects should a spa specify?

Choose them against the rooms either side. A shower following a sauna or hammam needs a warm rinse before anything cold; a shower feeding a plunge needs a cold mist or drench to bridge the temperature gap; a standalone recovery shower in a gym needs flow and pressure more than it needs chromotherapy. Every effect adds a flow, a pressure and a drainage requirement, so the specification has to be checked against the building’s capacity, not just the guest experience.

Does a Vichy shower need a special drain?

It needs a drain sized for a continuous flow rather than a burst, and it needs that drain to be reachable. A jet bar running for a whole treatment puts a steady volume onto the floor, so we prefer a linear channel under or beside the table, a short branch to the stack, falls formed in the screed rather than in the tile bed, and a trap that can be lifted from inside the room. Gravity drainage inside buildings is covered by EN 12056; the tanking beneath it by EN 14891 or ANSI A118.10.

Who installs experience showers and Vichy showers in Dubai, Riyadh, Doha and Abu Dhabi?

We do, from İstanbul, with our own installation teams travelling to site. We have delivered wet-area packages across the Gulf and hold local delivery pages for Dubai, Abu Dhabi, Riyadh and Doha. Our own certification is TS EN ISO 9001:2015; the equipment we install carries CE, TÜV, GS and comparable certification from its own manufacturers, such as EOS, Sentiotec and Condair.

Gallery

Shower systems examples

[ Related pages ]

Last updated: 6 November 2026

Ready to learn more?

Book a consultation or speak with our team.

We’d love to cooperate
TO BUILD AMAZING POOLSAUNATURKISH BATH & HAMMAMSNOW ROOMSTEAM ROOMSALT ROOMWHIRLPOOL

Sauna Dekor Spa Solutions

Sauna Dekor Spa Solutions was established in 1987. In order to spread the use of Spa & Wellness, it introduced its products in many international fairs and followed the innovations abroad and examined the Spa & Wellness culture on-site, and made perfect applications with quality materials and correct manufacturing techniques.

Talk to our team

Dubai office · Istanbul factory

WhatsApp+90 532 215 64 78Call Dubai+971 58 558 1295Request a quote