04Ventilation
Supply low behind or beside the heater, extract low on the opposite wall, sized for roughly three to six air changes an hour in use. The cabin also runs a drying cycle after the session. Doha’s outdoor humidity is high for much of the year, which makes the post-session dry-down more important here than it is in a dry inland climate — a cabin that is never allowed to dry out will show it in the bench timber within a couple of seasons.
Heater and controls
A floor-standing stone heater with a slatted timber guard. The guard is not decoration; it fixes the clearance between bathers and the heater body, and it has to be dimensioned to the heater manufacturer’s own clearance table rather than to the joinery drawing. Control is external and digital, with a temperature limiter and a door contact, so the cabin can be brought up to temperature without opening it.