04Ceiling geometry and condensate
Steam room ceilings are laid to a fall so condensate runs to the perimeter and down the wall rather than dropping from directly overhead. A flat steam room ceiling drips, and no amount of ventilation fixes it afterwards.
Waterproofing and penetrations
The build-up is an insulated core board, a bonded waterproofing membrane taken across floor, walls and ceiling with banded corners, then adhesive and grout selected for continuous wet heat. Every fitting that pierces that membrane — ceiling shower, body jets, chromotherapy heads, lit niches, control panel, hand shower — is a designed penetration with its own sealed collar. On a chromotherapy room the penetration count is what makes or breaks the tanking, so the lighting layout is fixed before waterproofing starts, not after.