Shotcrete, Overflow and Skimmer Pools: What the Pool Contractor Builds

Short answer: A swimming pool contractor is responsible for the shell, the waterproofing, the hydraulics and the plant room, not only the finish. Sauna Dekor builds shotcrete, overflow and skimmer pools for hotels, resorts and villas in the UAE, Saudi Arabia and Qatar, as one scope.
Pool water · 25–28 °CDesign · Manufacturing · Installation5,000+ projects · 41+ countries · since 1987

Sauna Dekor — saunas, Turkish hammams, steam rooms, salt rooms and pools, manufactured since 1987 in our own facility in İkitelli OSB, Istanbul; 5,000+ projects in 41+ countries.

25–28 °CPool water
Pool water25–28 °C (competition pools, World Aquatics)
Olympic pool50 × 25 m · depth at least 2 m, 3 m recommended
Spa pool, for comparison30 °C
ManufacturingOwn facility, İkitelli OSB, Istanbul
Warranty24 months workmanship + 24 months equipment + 5 years structure and waterproofing

[ What to know ]

Pool water

25–28°C

Pool water

Olympic pool

50 × 25m

depth at least 2 m, 3 m recommended

Spa pool, for comparison

30°C

30 °C

Manufacturing

Own facility, İkitelli OSB, Istanbul

01 — 111 words

Turquoise-tiled outdoor pool with carved elephant figures, a stacked stone wall and a parasol

Sauna Dekor builds shotcrete (gunite) swimming pools, overflow (deck-level) pools and skimmer pools as a turnkey contractor for hotels, resorts and private villas in the UAE, Saudi Arabia and Qatar, manufacturing in Istanbul since 1987 — our 40th year — with projects delivered in 41+ countries. The first decision on a pool is not the finish. It is whether the water sits flush with the surround and spills into an overflow channel feeding a balance tank, or sits below the coping behind skimmers. That single choice sets the shell, the hydraulics, the plant room and the tiling detail, and it is expensive to reverse once the steel is fixed.

View case studies

sauna dekor

Courtyard pool lined with turquoise mosaic tiles beside a timber deck, rattan sofas and glass sliding doors

02 — 57 words

Sizing a Shotcrete Pool: Dimensions, Depth and Freeboard

Open Area Design: Tailor the pool dimensions to fit the designated space, ensuring seamless integration with your surroundings.

Budget Consideration: Set a budget aligned with your project goals, allowing for the use of quality materials and decorative enhancements.

Material Options: Enrich your swimming pool's design by exploring alternative forms and materials, seamlessly blending with your living spaces.

03 — 149 words

Shotcrete, Reinforced Concrete and Prefabricated Pool Shells

Sauna Dekor has manufactured spa and wet-area equipment in Istanbul since 1987 and is now in its fortieth year, with projects delivered in 41+ countries. On the pool side the shell decides the programme: a shotcrete (gunite) shell is sprayed against a steel cage and shaped on site, which suits free-form geometry, deep ends and an infinity edge; a reinforced concrete shell poured against formwork suits rectilinear pools and heavily loaded rooftop or podium structures; a prefabricated shell shortens site time where access allows it. Our comprehensive services span diverse concepts, ensuring aesthetic designs tailored to various models and sizes, turning dreams into realities. Whether for a private residence, holiday resort, hotel, spa center, or luxury villa, Sauna Dekor is your contractor in creating swimming pools that elevate lifestyle experiences. Welcome to a world where expertise meets excellence, and dreams take a refreshing dive into reality.

04 — 79 words

Stages of a Shotcrete Swimming Pool Build

Site Preparation: Determine the pool area, perform excavation, and correct the ground to lay a strong foundation.
Construction: Pour concrete into the pool area, insulate inner walls, and complete electrical and water systems. Execute steel construction for structural integrity.

Finishing Touches: Apply screed, plaster, and ceramic flooring, or opt for a pool lining to infuse your pool with vibrant color.

Completion: Fill the pool with water, install lighting elements, and conduct necessary controls for a fully functional swimming pool.

05 — 141 words

Overflow Channel, Balance Tank and Pool Hydraulics

On a deck-level (overflow) pool the channel grating, the balance tank volume and the surge capacity are sized together with the circulation rate; on a skimmer pool the water sits below the coping and the skimmers do the surface work, which is simpler to build but leaves a waterline that has to be tiled and cleaned. Our commitment to excellence extends to every facet of your project, ensuring enduring beauty and functionality. By employing the highest quality materials and a keen focus on application intricacies like ceramics and joints, we work for long-term user comfort and the longevity of your pool. Entrust your vision to our seasoned and dedicated team, where expertise meets artistry, resulting in a pool that stands as a testament to luxury, sophistication, and enduring quality for years to come. Your dream pool, our unwavering commitment to perfection.

07 — 97 words

Shotcrete, overflow and skimmer pools for hotels, resorts and villas in the UAE and the GCC

Sauna Dekor designs, builds and services swimming pools for hotels, resorts, wellness centres and private villas in the UAE, Saudi Arabia and Qatar. We have manufactured spa and wet-area equipment in our own facility in Istanbul since 1987 — our fortieth year — and have delivered projects in 41+ countries. Pools reach us the way they reach a building: attached to a sauna, a steam room, a hammam or a cold plunge, with one set of drawings and one MEP interface. That is the practical argument for keeping design, construction and after-sales inside one company.

Bright indoor pool with a glass roof and planted edges

08 — 78 words

What the pool contractor is responsible for: shell, hydraulics and plant

  • Design against the site, the brief and the approval regime — not a catalogue shape dropped into a garden
  • Drawings, calculations and authority submissions
  • Excavation, ground correction and the structural shell
  • Waterproofing, which is the single detail that decides whether the pool is still sound in ten years
  • Circulation, filtration, disinfection, heating and chilling
  • Electrical works, underwater lighting and control
  • Interior finish, coping and the surround
  • Filling, water balancing, commissioning and handover documentation
  • Service, maintenance and warranty afterwards

09 — 182 words

Shotcrete, reinforced concrete, fibreglass and prefabricated shells compared

Swimming pool construction methods — what each is good for and what it costs you later
TypeStrengthsLimitsBelongs in
Reinforced concrete, tiled or mosaicAny geometry and depth, longest structural life, integrates with architecture, repairable in placeLongest programme; waterproofing and grout detailing must be right first timeHotel, resort and villa pools, and anything with a vanishing edge or a level change
Prefabricated fibreglass shellFast to install, monolithic with no joints to leak, low maintenance surfaceGeometry fixed at order; access route has to take the shellVillas and compact plots where programme matters more than shape
Vinyl linerLowest installed cost, quick, forgiving of ground movementThe liner is a consumable and is replaced periodicallyTemporary or budget-led residential installations
Stainless steelThin structure, precise edges, hygienic, ideal where structure is being added above an existing slabHighest material cost; fabrication tolerance is unforgivingRooftop and retrofit pools, and wellness pools inside buildings

Format is a separate question from construction type. We build indoor, outdoor, Olympic, infinity, prefabricated and ornamental and landscape pools.

10 — 164 words

Stages of a shotcrete pool build

Swimming pool construction sequence and what each stage settles
StageWorkWhat it settles
1. Brief and surveySite levels, ground conditions, access, services, orientation and shadeWhether the pool the client is imagining can be built where they want it
2. Design and approvalsLayout, depths, edge type, plant room, drawings and authority submissionThe programme — approvals, not construction, are usually the long pole
3. Excavation and ground correctionDigging, soil correction, blinding, dewatering where the water table demands itWhat the shell is standing on
4. StructureSteel, shuttering and concrete, or shell placementGeometry and structural life
5. WaterproofingTanking, movement joints, sealed penetrationsWhether the building around the pool stays dry
6. MEPCirculation, filtration, disinfection, heating and chilling, lighting, automationRunning cost and water quality
7. FinishTile, mosaic, plaster or liner; coping, deck and surroundAppearance and slip safety
8. Fill, balance and handoverWater balancing, equipment testing, O&M documents, warranty, service planWhat the operator receives

11 — 155 words

Five mistakes clients make when appointing a pool company

  • Splitting design, build and service between three companies. Every interface between them becomes the client’s risk.
  • Taking the lowest number. On a pool the saving is normally taken out of waterproofing or plant — both invisible until they fail.
  • Leaving approvals with the client. Authority requirements differ between emirates and between a villa community and a hotel plot, and they set the programme.
  • No written, itemised scope. Most pool disputes are scope disputes.
  • Ignoring what happens after handover. Water balancing, filter service and equipment life are the real cost of ownership, and they should be priced before the contract, not after.

For the Gulf version of this decision — ground conditions, evaporation, approvals and plant sizing — see our guides to swimming pool construction in Dubai and indoor pools in Dubai. Where the pool is part of a wellness programme rather than a leisure one, see hydrotherapy pools and what hydrotherapy actually is.

12 — 159 words

Who builds the shotcrete shell, where the works are made, and who makes the plant

The reinforcement, the shotcrete shell, the overflow channel, the balance tank, the tiling and the coping are built and installed by Sauna Dekor, and the fitted stone and joinery around the pool are made in the company’s own workshop at İkitelli OSB, Başakşehir, Istanbul by nineteen people. The same company commissions the pool in the UAE, Saudi Arabia and Qatar, which is the scope a pool contractor is being asked to carry. Sauna Dekor has manufactured since 1987, is in its fortieth year and has completed work in 41+ countries.

The circulation pumps, the sand filters, the dosing plant and the heating are bought-in equipment made by their own manufacturers and supplied with those manufacturers’ certification. Sauna Dekor’s own certificate is TS EN ISO 9001:2015, covering the manufacture of sauna and spa products and after-sales service.

The construction type is chosen before the finish is; the shared scope behind every pool type is set out here.

Long indoor pool with a mirrored ceiling and lit side walls

Comparison

Pool water temperatures compared

Water temperatures of the pools we build. Competition pools follow the World Aquatics range; a spa pool runs warmer; a cold plunge closes the circuit.

PoolWater temperatureBasis
Competition swimming poolWater 25–28 °CWorld Aquatics
Spa / hydrotherapy poolWater 30 °CTypical operating value
Cold plunge poolWater 2–15 °CBuilt to the specified setpoint

Sources: Sauna Dekor approved operating values (October 2026); competition pools: World Aquatics Facilities Rules FR 2.

Comparison

How do the pool types differ in size, water edge, shell and finish?

Pools differ by how the water surface is skimmed and how the body is built. Overflow and finish are chosen after the sizing and the hydraulics, not before.

TypeWhat defines itWater edgeShell and finish
Swimming poolSized to its use, the space and the budgetSkimmer or overflowConcrete or shotcrete shell; glass mosaic, porcelain, liner or natural stone
Indoor swimming poolHumidity and ventilation designed with the poolSkimmer or overflowConcrete shell; finish chosen for an enclosed hall
Olympic pool50 × 25 m, depth at least 2 m (3 m recommended), 8 lanes of 2.5 m plus 2 empty lanesOverflow channel around the poolWorld Aquatics Facilities Rules
Infinity poolOne edge ends in a weir below the water lineCatch channel and balance tankConcrete shell; the edge is levelled precisely
Prefabricated poolPool body made in one piece, delivered ready to installIntegrated skimmerFibreglass or precast shell
Outdoor swimming poolPlanned to the size and the ground of the siteSkimmer or overflowExcavation, waterproofing, concrete and lining
Ornamental and landscape poolDecorative water planned with the landscape—Waterproof liner

Sources: Olympic dimensions — World Aquatics Facilities Rules FR 2; Sauna Dekor pool construction scope.

Stage by stage, from survey to first fill: how a swimming pool is built.

FAQ

Frequently asked questions

What is the pool contractor responsible for on a shotcrete pool?

A pool company is responsible for the whole chain, not the excavation alone: design against the site and the brief, drawings and approvals, excavation and ground correction, the structural shell, waterproofing, circulation and filtration, heating and chilling, lighting and electrical, the interior finish, the surround and coping, commissioning and water balancing, then handover documentation and after-sales service. Where those responsibilities are split between companies is where pool projects usually fail.

Reinforced concrete, fibreglass or vinyl liner — which pool construction type should I choose?

Reinforced concrete takes any geometry and lasts longest, which is why hotel and villa pools are built that way. A prefabricated fibreglass shell is faster and lower maintenance but fixes the shape at order. A vinyl liner is the cheapest to install and the liner is a consumable. On Gulf projects the decision is usually made by geometry, ground conditions and how the pool has to meet the architecture, not by the headline construction cost.

How long does it take to build a swimming pool?

A straightforward residential pool runs roughly 8–14 weeks on site once approvals are in hand. Approvals, ground conditions and any structural work below the shell are what move the programme, not the tiling. Pools that form part of a wellness scheme — with a plunge, a hydrotherapy pool or a spa floor above — run longer because the MEP coordination is shared.

Do I need permits to build a swimming pool in the UAE?

Yes. A pool needs authority approval covering structure, electrical works, water supply and drainage, and safety provisions, and the requirements differ between emirates and between a villa community and a hotel plot. We prepare and submit the drawings and carry the approval process as part of the scope rather than leaving it with the client.

What should I check before appointing a pool company?

Ask who holds the design, who holds the approvals, and who returns for service — if those are three different companies, the interfaces are the client’s problem. Ask for delivered projects of comparable type and climate. Ask what the warranty covers and for how long. Insist on a written, itemised scope, because most pool disputes are scope disputes. And treat the lowest number with suspicion: on a pool, the saving is normally taken out of waterproofing or plant, and both are invisible until they fail.

Who builds shotcrete and overflow swimming pools for hotels and villas in the UAE?

Sauna Dekor designs, builds and services swimming pools for hotels, resorts, wellness centres and private villas in the UAE, Saudi Arabia and Qatar. We have manufactured spa and wet-area equipment in our own facility in Istanbul since 1987 and have delivered projects in 41+ countries, with pools handled alongside the sauna, steam, hammam and cold-water rooms they usually sit next to.

From our portfolio

Pool projects

Rooms we manufactured in Istanbul and installed with our own team. Each frame opens the project page.

All projects
Pools project, Doha · Qatar
Pools, Sauna, Spa Hot Tub, Steam Rooms · Doha · Qatar · 2022
Steam Room project, Istanbul · Türkiye
Steam Room, Sauna, Pools · Istanbul · Türkiye · 2019
Turkish Bath & Hammam project, Istanbul · Türkiye
Turkish Bath & Hammam, Steam Rooms, Pools, Sauna · Istanbul · Türkiye · 2017
Sauna project, Batumi · Georgia
Sauna, Swimming Pool · Batumi · Georgia · 2014
Sauna project, Istanbul · Türkiye
Sauna, Steam Room, Pool · Istanbul · Türkiye · 2019
Turkish Bath & Hammam project, Istanbul · Türkiye
Turkish Bath & Hammam, Sauna, Pools, Steam Rooms · Istanbul · Türkiye · 2019
Turkish Bath & Hammam project, Istanbul · Türkiye
Turkish Bath & Hammam, Steam Rooms, Pools, Sauna · Istanbul · Türkiye · 2015
Sauna project, Sulaymaniyah · Iraq
Sauna, Swimming Pool, Hammam, Flotation Pool · Sulaymaniyah · Iraq · 2013

Gallery

Pool examples

Long indoor pool lit blue, with columns, exposed ductwork, a pitched ceiling and rows of loungers

Get a quote for a pool

Send us the room size and ceiling height; we will work out the scope and the budget range with you.

[ Related pages ]

Last updated: 6 November 2026

Ready to learn more?

Book a consultation or speak with our team.

We’d love to cooperate
TO BUILD AMAZING POOLSAUNATURKISH BATH & HAMMAMSNOW ROOMSTEAM ROOMSALT ROOMWHIRLPOOL

Sauna Dekor Spa Solutions

Sauna Dekor Spa Solutions was established in 1987. In order to spread the use of Spa & Wellness, it introduced its products in many international fairs and followed the innovations abroad and examined the Spa & Wellness culture on-site, and made perfect applications with quality materials and correct manufacturing techniques.

Talk to our team

Dubai office · Istanbul factory

WhatsApp+90 532 215 64 78Call Dubai+971 58 558 1295Request a quote