+971 58 558 1295 ENTR Request a Quote
Seaside infinity pool with timber pergola, day beds and turquoise water beyond a rock breakwater

[ Blog ]

Swimming Pool Construction in Jeddah and Dammam: Coastal Villas, Compounds and Hotels

Swimming pool construction in Jeddah and Dammam: groundwater, salt air, sabkha soils, humid summers and water balance, and what each changes in the pool.

Sauna Dekor Spa Solutions — designing, manufacturing and installing saunas, steam rooms, hammams and pools since 1987, in our own facility in İkitelli OSB, Istanbul.

TopicSwimming Pool Construction in Jeddah and Dammam
Reading8 minutes
Sections10
Published21 November 2026
Updated

Sauna Dekor Spa Solutions engineering team, Istanbul · project and press enquiries: Alican Aykaç, Managing Partner

Updated: 21 November 2026

Short answer: a swimming pool in Jeddah or Dammam is built like any reinforced-concrete, stainless steel or fibreglass pool, but 4 coastal conditions change the design: high groundwater, salt in the air, aggressive soils on the Gulf coast and humid summers. Sauna Dekor Spa Solutions builds villa, compound and hotel pools in Jeddah, Dammam and Al Khobar, coordinated from our Dubai office, with our own teams on site for installation, commissioning and handover.

This page is for villa owners, compound developers and hotel teams on the Red Sea and Gulf coasts. Pool types, permits and the Riyadh climate are covered on our page about swimming pool construction in Saudi Arabia; the general stages are on our page about swimming pool construction. This page covers what is different on the coast.

Why is a coastal pool in Saudi Arabia different from a Riyadh pool?

Because the ground and the air are different. Riyadh is inland, dry and dusty, with hard water. Jeddah and Dammam sit on the coast, where the water table can be close to the surface, the air carries salt and the summer air is humid. Those 3 facts change the excavation, the structure, the choice of metal and the plant room.

Why is a coastal pool in Saudi Arabia different from a Riyadh pool?
ConditionJeddah (Red Sea)Dammam and Al Khobar (Gulf)What it changes
Groundwatercan be shallow near the shoreoften shallow on low coastal grounddewatering, waterproofing outside the shell, uplift check
Soilvaries; coastal and reclaimed plots need testingsalt flats (sabkha) with sulphates and chlorides in placesconcrete mix, cover to reinforcement, external protection
Airsalty and humidsalty and very humid in summersteel grade, fixings, plant room ventilation
Summer water temperaturewell above the comfort bandwell above the comfort bandcooling plant, shade, cover

None of this is decided from a map. A soil investigation with a groundwater reading is the first document we ask for on a coastal plot, before the pool is drawn.

How is a swimming pool built in Jeddah?

On the Red Sea coast the 2 questions are water in the ground and salt in the air. Both are answered on paper before excavation: the soil report gives the water table, and the specification lists every metal part that will sit in salty, humid air, from the ladder to the fixings in the plant room.

Groundwater. Where the water table is high, the excavation is dewatered while the shell is built, and the waterproofing is designed to hold water out as well as in. An empty pool on high groundwater can be pushed upwards, so the structural engineer checks uplift and the operating manual says when the pool may and may not be drained. A hydrostatic relief valve in the floor is one of the details that protects the shell.

Salt air. Ladders, handrails, lighting rings, grilles and fixings near the sea are specified in a stainless grade suited to chlorides, and the same thinking applies inside the plant room. Electrical panels sit in a ventilated, dry space away from the chemical store. For a pool with a view of the sea, the edge is often an infinity or overflow edge; the options are compared in our page on pool overflow types, and the edge itself on our page about the infinity pool.

Long rectangular outdoor pool beside a glass-fronted villa with palm trees, sun loungers and a pale stone deck
A long villa pool in a palm garden. On the coast, the deck drains, the coping joints and every metal fitting are chosen for salt air before the finishes are ordered.

How is a swimming pool built in Dammam and Al Khobar?

On the Gulf coast the ground needs the most attention. Parts of the Eastern Province sit on sabkha, salt-flat soil with a shallow water table and 2 kinds of salt, sulphates and chlorides, that attack ordinary concrete and steel reinforcement. Where the soil report shows them, the concrete mix, the cover to the reinforcement and the external protection of the shell are designed for them.

A pool that leaks into aggressive ground, or takes aggressive groundwater in, fails from the outside, so the waterproofing is tested with water before any tile goes on. In the Eastern Province we delivered a wellness project for Next Wellness Club in Al Khobar in 2024.

The summer air in Dammam and Al Khobar is hot and very humid. Outdoor pools need cooling to stay near the 26–28 °C range most villa and hotel pools are held at, and the humid air makes air-cooled plant work harder than in Riyadh, so the plant room is placed where it can take in fresh air and reject heat. Indoor pools in compounds and hotels need dehumidification sized for the pool's evaporation; our page on the indoor swimming pool explains the air side.

Resort pool in turquoise tile with a stone-clad overflow wall below tiered guest balconies on a green hillside
A resort pool with a stone-clad overflow wall. Where the ground is aggressive, the protection on the outside of the shell matters as much as the finish on the inside.
Curved resort pool with a slotted overflow grating along its edge, palms and low-rise guest wings behind
A curved resort pool with an overflow grating. On a compound or hotel pool the balance tank and the overflow channel are sized for bather load, not for the pool's area alone.

How are water balance and cooling handled on the coast?

With 1 test and 1 reversible plant. The first fill is tested, and the treatment is set from that test. Mains water on both coasts comes largely from desalination, which tends to be soft and low in calcium; some sites blend in or rely on other sources. Soft water takes calcium from cement-based grout, hard water leaves scale, so we measure rather than assume.

Cooling follows the same logic as in Riyadh: a heat pump that can cool in summer and heat in winter, sized after shade and a cover have reduced the load. Filtration is sized for dust and wind-blown sand, and the backwash water needs a drain the municipality accepts. For the plant room layout, see our guide to the spa plant room.

Which pool type suits a coastal villa or compound?

Usually 1 of 4, as in the rest of the Kingdom: a tiled reinforced-concrete pool, a stainless steel pool, a fibreglass (polyester) pool or a prefabricated pool. On the coast the ground often decides.

A concrete shell can be designed for groundwater and aggressive soil; a one-piece fibreglass or prefabricated pool needs a base and anchoring designed for uplift where the water table is high. We build stainless steel pools on a project basis, and on the coast the grade of steel and the chloride level of the water are agreed before fabrication.

For finishes, glass mosaic, porcelain and stone all work when the adhesive and grout suit the water; see our guide to pool tiles. Garden pools are covered on our page about the outdoor swimming pool.

In what order is a coastal pool built?

In 9 stages. The programme depends on pool type, size, ground conditions and permits, so it is fixed per project after the soil report. The soil report comes first because it decides the excavation method, the shell design and whether the pool may ever be drained; the water test before finishes protects the shell.

  1. Soil investigation with a groundwater reading.
  2. Drawings: structure designed for the ground, hydraulics, plant room, electrical; municipal permit applied for.
  3. Equipment ordered and registered for import.
  4. Excavation, with dewatering where the water table requires it.
  5. Shell, or base and anchoring for a one-piece pool.
  6. Waterproofing and a water test before any finish.
  7. Pipework, plant room and electrical, with corrosion-resistant fittings.
  8. Tiles, coping and deck.
  9. Testing, first fill, water balance from the test, and handover with the operating manual and operator training.

The warranty is the same on every pool we build: 24-month warranty on workmanship and manufacturing; 24-month manufacturer's warranty on electrical and mechanical equipment; 5-year warranty on structure and waterproofing.

Frequently asked questions about swimming pools in Jeddah and Dammam

Do you build swimming pools in Jeddah?


Yes. We build villa, compound and hotel pools in Jeddah, coordinated from our Dubai office, with our own teams on site for installation, commissioning and handover.

Do you build pools in Dammam and Al Khobar?


Yes. Projects in Dammam, Al Khobar and the rest of the Eastern Province are run the same way, starting with a soil investigation because of the shallow groundwater and salt-flat soils in parts of the region.

Can a pool be built where the groundwater is high?


Yes. The excavation is dewatered during construction, the shell and waterproofing are designed for water pressure from outside, and the structural engineer checks uplift so the pool is not lifted when it is empty.

Can I drain my pool in Jeddah or Dammam?


Only when the groundwater allows it. On a high water table an empty pool can be pushed upwards, so the operating manual we hand over says when and how the pool may be drained.

What temperature should a coastal villa pool be kept at?


Usually 26–28 °C, the common comfort range for villa and hotel pools. On both coasts this needs cooling in summer, from a heat pump that can also heat in winter.

Which metal fittings last near the sea?


Stainless steel in a grade suited to chlorides, for ladders, handrails, lighting rings, grilles and fixings, with the water balance kept in range so the pool water does not add to the corrosion.

How do I start a pool project in Jeddah or Dammam?

Send us the plot location, the pool size you have in mind and the soil report if you have one. We reply within one business day. WhatsApp: +971 58 558 1295, or use our contact page.

Sauna Dekor Spa Solutions is a sauna, steam room, hammam and pool manufacturer founded in 1987 and now in its 40th year of manufacturing in Istanbul, with a team of 19, TS EN ISO 9001:2015, and 5,000+ projects in 41+ countries, including 577+ hotel and resort projects. Equipment is made by its manufacturers, whose certification belongs to them.

Sources

Our work

Pool projects

Alican Aykaç, Managing Partner, Sauna Dekor
[ Author ]

Alican Aykaç · Managing Partner, Sauna Dekor Spa Solutions

Sauna Dekor Spa Solutions has designed, manufactured and installed saunas, steam rooms, hammams and pools since 1987, in its own facility in İkitelli OSB, Istanbul: 5,000+ projects in 41+ countries, including 577+ hotel and resort projects.

About Alican Aykaç

[ Related applications ]

Planning a room like this?

Send us the drawing or the room size. We will work out the heater, ventilation and finishes the room needs.

Ready to learn more?

Book a consultation or speak with our team.

We’d love to cooperate
TO BUILD AMAZING POOLSAUNATURKISH BATH & HAMMAMSNOW ROOMSTEAM ROOMSALT ROOMWHIRLPOOL

Sauna Dekor Spa Solutions

Sauna Dekor Spa Solutions was established in 1987. In order to spread the use of Spa & Wellness, it introduced its products in many international fairs and followed the innovations abroad and examined the Spa & Wellness culture on-site, and made perfect applications with quality materials and correct manufacturing techniques.

Talk to our team

Dubai office · Istanbul factory

WhatsApp+971 58 558 1295Call Dubai+971 58 558 1295Request a quote