Swimming Pool Construction in Saudi Arabia: Riyadh Villas and Hotels

Swimming pool construction in Saudi Arabia in 7 decisions: pool type, permits, hard water, summer heat, dust and filters, plant room and the build order.

Sauna Dekor Spa Solutions — designing, manufacturing and installing saunas, steam rooms, hammams and pools since 1987, in our own facility in İkitelli OSB, Istanbul.

TopicSwimming Pool Construction in Saudi Arabia
Reading7 minutes
Sections9
Published16 November 2026
Updated

Sauna Dekor Spa Solutions engineering team, Istanbul · project and press enquiries: Alican Aykaç, Managing Partner

Updated: 18 November 2026

Short answer: the length of swimming pool construction in Saudi Arabia depends on pool type, size and site, and the water is held at 26–28 °C, the comfort band behind World Aquatics' 25–28 °C rule for competition pools. In Riyadh that means planning for cooling, hard water and dust from day 1. Sauna Dekor Spa Solutions builds villa and hotel pools across Saudi Arabia, coordinated from our Dubai office.

This guide is for villa owners, developers and hotel teams in Riyadh and the rest of the Kingdom who are about to brief a pool contractor. It sets out the 7 decisions that fix most of the cost and most of the problems, in the order they should be made. The general construction stages are on our page about swimming pool construction; this page covers what changes in Saudi Arabia.

Long straight infinity edge in pale mosaic with the pool water running over it towards the sea and a hillside
An infinity edge in mosaic: the overflow line is fixed in the shell drawings, not on site. Project photograph; project not named.

Which pool type suits a Riyadh villa or hotel?

Usually 1 of 4: a tiled reinforced-concrete pool, a stainless steel pool, a fibreglass (polyester) pool or a prefabricated pool. Concrete gives any shape and any finish. Stainless steel is built on a project basis where a fast, precise install matters. Fibreglass and prefabricated pools suit smaller villa gardens, and a prefabricated pool can sit in-ground, semi-in-ground or above ground.

The choice follows 3 questions: how the pool will be used (laps, family, hotel guests), how much time the programme allows, and how wide the access route is. A one-piece shell needs a crane path into the garden; a concrete pool needs space for excavation and formwork.

Which pool type suits a Riyadh villa or hotel?
Pool typeSuitsWhat to check first
Reinforced concrete, tiledany shape, hotels, overflow poolssoil report, structural design, waterproofing system
Stainless steelprecise shapes, rooftops, fast site timestructural support, delivery and lifting route
Fibreglass (polyester)villa gardens, standard sizescrane access, ground preparation
Prefabricatedsmall plots, semi-in-ground or above-ground uselevel base, plant position

Which permits and codes apply in Saudi Arabia?

2 layers usually apply: the municipal building permit for the villa or hotel works, most of which run through the Balady platform, and the Saudi Building Code 2024 for the electrical and fire scope, issued by the Saudi Building Code Center. In addition, imported pumps, controls and electrical fittings are registered on SASO's SABER platform before customs clearance.

For a hotel, the operator's brand standards add a third layer: water quality, lifeguard positions, depth markings and plant-room access are often written into the brand's technical manual. We ask for that manual at the start, because it can change the pool depth and the overflow detail.

How does Riyadh's hard water change the pool?

In 3 ways: scale on tiles at the waterline, scale inside heaters and heat exchangers, and higher chemical demand to keep the water balanced. Published sampling of Riyadh tap water reports total dissolved solids from 68 to 793 mg/L, a mean of 499 mg/L (Alanazi et al., 2021), because the network blends desalinated supply with groundwater. Coastal Gulf cities on desalinated water rarely see this.

The answer is planned, not improvised: the first fill is tested, water balance is set from that test, and the heat exchanger or heat pump is specified with the scale risk in mind. Where the building also has a steam room or hammam, softening goes on that feed as well.

Curved mosaic-lined indoor pool with lit water in front of a dark figured marble feature wall
An indoor hotel pool with a curved mosaic lining: the waterline tiles are where scale shows first in hard water. Project photograph; project not named.

How is pool water kept comfortable in a Riyadh summer?

With a reversible heat pump or a chiller that can remove heat in summer and add it in winter, because an outdoor pool in Riyadh drifts well above the 26–28 °C comfort band in July and August. ASHRAE puts Riyadh's 0.4 % summer design temperature at 44.9 °C, with a low wet-bulb, so the air is very hot but dry.

That dry air helps in 2 ways: the water loses heat by evaporation, and air-cooled plant rejects heat more easily than on the humid coast. It also costs water, so the top-up line and the water meter are sized for summer evaporation. Shade over part of the pool reduces the sun's gain more cheaply than any extra plant. How the same question is handled in the UAE is set out on our page about the swimming pool in Dubai.

What do dust and sand do to the filtration?

They load the filters faster than in most climates, so 3 things are sized for it: the filter area, the backwash water and drain, and the skimmer or overflow capacity. After a dust event a pool can need a backwash within the same day. A deck-level overflow pool takes surface dust into its channel quickly, while a skimmer pool relies on the skimmer count and position.

The choice between skimmer and overflow edge is one of the first drawing decisions; the 4 overflow types are compared in our page on pool overflow types.

Where should the plant room go?

As close to the pool as the plot allows, with 4 things built in: fresh air for the cooling plant, a floor drain, a backwash drain the municipality accepts, and a door wide enough to replace the largest unit. In Riyadh a sealed basement plant room can overheat in summer, so its ventilation is drawn with the plant, not added later.

Chemical storage sits apart from the electrical panel, and dosing points are placed after the heat exchanger so that concentrated chemicals never pass through it.

Indoor pool with wide tiled entry steps, a stainless steel handrail and a pale stone surround
Wide entry steps with a handrail: steps, ladders and depth changes are fixed in the shell drawing. Project photograph; project not named.

In what order is swimming pool construction in Saudi Arabia done?

In 8 stages, with a build time that depends on pool type, size and site: survey, drawings and permits, excavation, shell, waterproofing, pipework and plant, finishes, then testing and first fill. On Saudi projects 2 steps are added early: SABER registration of the imported equipment, and the water test that sets the treatment for the first fill.

  1. Site survey: access route, soil, levels, power and water supply.
  2. Drawings: structure, hydraulics, plant room, electrical; municipal permit applied for.
  3. Equipment ordered and registered for import.
  4. Excavation and shell (or base, for a one-piece pool).
  5. Waterproofing and a water test before any finish.
  6. Pipework, plant room, cooling and heating, controls.
  7. Tiles or stone, coping and deck.
  8. Commissioning, first fill, water balance and handover to the owner or operator.

For a pool that is part of a full villa spa or hotel spa in the Kingdom, the other rooms we build in Riyadh are on our Riyadh page.

Sauna Dekor Spa Solutions is a sauna, steam room, hammam and pool manufacturer since 1987: 40 years of manufacturing in Istanbul, a team of 19, TS EN ISO 9001:2015, and 5,000+ projects in 41+ countries, including 577+ hotel and resort projects, with 732 documented references in 32 countries and territories. Every project carries 24 months on workmanship and manufacturing, 24 months manufacturer's warranty on electrical and mechanical equipment, and 5 years on structure and waterproofing. Pumps, filters and heat pumps are made by their manufacturers, whose certification belongs to them. Our full range is on our products page.

Who designs and who builds a pool in Saudi Arabia?

Three parties share the work. The pool designer fixes the type, the water volume, the overflow detail and the plant, and produces the drawings the permit needs. The main contractor builds the structure: the excavation, the reinforced shell and the plant room. The pool specialist fits the circulation, the filtration, the heating and cooling and the finishes, then tests and hands over. On a villa these roles often sit with one firm; on a hotel they are usually split, and the drawings have to say who supplies each item. Sauna Dekor Spa Solutions plans and builds pools for villas and hotels in Saudi Arabia, coordinated from our Dubai office.

Frequently asked questions about swimming pool construction in Saudi Arabia

How long does it take to build a pool in Riyadh?


It depends on pool type, size and site. A prefabricated or fibreglass pool is quicker to build than a large concrete overflow pool for a hotel. Permits and equipment import are planned into the same programme.

What temperature should a villa pool be kept at?


Usually 26–28 °C, the common comfort range for villa and hotel pools; competition pools are held at 25–28 °C under World Aquatics rules. In Riyadh this needs cooling in summer and some heating in winter, from the same reversible plant.

Do you build pools outside Riyadh?


Yes. Projects in Jeddah, Riyadh, Al Khobar and Dammam are coordinated from our Dubai office at Latifa Tower, and our own teams travel to site for installation, commissioning and handover. On the Red Sea coast, plant and fixings are specified with corrosion in mind.

Is a stainless steel pool a good choice in Saudi Arabia?


It can be, where precise shapes, a rooftop or short site time matter. We build stainless steel pools on a project basis. The grade of steel, the water balance and the chloride level are agreed before fabrication, because they decide the pool's long-term finish.

Does hard water damage a pool?


It does not damage the shell, but it leaves scale at the waterline and inside heat exchangers if the water is not balanced. In Riyadh the first fill is tested and the treatment is set from that result, then checked on every service visit.

Can a pool and a sauna share one plant room?


Often, yes, if the room has space, fresh air and drains for both. The pool plant, a steam generator and a cold plunge chiller each need service access, so the shared room is drawn with all of them before the slab is poured.

Sources

Our work

Pool projects

Alican Aykaç, Managing Partner, Sauna Dekor
[ Author ]

Alican Aykaç · Managing Partner, Sauna Dekor Spa Solutions

Sauna Dekor Spa Solutions has designed, manufactured and installed saunas, steam rooms, hammams and pools since 1987, in its own facility in İkitelli OSB, Istanbul: 5,000+ projects in 41+ countries, including 577+ hotel and resort projects.

About Alican Aykaç

[ Related applications ]

Planning a room like this?

Send us the drawing or the room size. We will work out the heater, ventilation and finishes the room needs.

Ready to learn more?

Book a consultation or speak with our team.

We’d love to cooperate
TO BUILD AMAZING POOLSAUNATURKISH BATH & HAMMAMSNOW ROOMSTEAM ROOMSALT ROOMWHIRLPOOL

Sauna Dekor Spa Solutions

Sauna Dekor Spa Solutions was established in 1987. In order to spread the use of Spa & Wellness, it introduced its products in many international fairs and followed the innovations abroad and examined the Spa & Wellness culture on-site, and made perfect applications with quality materials and correct manufacturing techniques.

Talk to our team

Dubai office · Istanbul factory

WhatsApp+90 532 215 64 78Call Dubai+971 58 558 1295Request a quote